Writing
Technical writing
Quality
September 2026 · 5 min read
What Makes an NCR Actually Closed?
A nonconformance is not closed when the part is fixed. It is closed when the process that produced it can no longer produce it undetected — and when there is objective evidence of that.
Read
Infrastructure
September 2026 · 6 min read
Why FAT Is Too Late to Discover Manufacturing Risk
By the time equipment reaches factory acceptance testing, the cost of a finding has already multiplied. What upstream evidence should have caught it, and where hold points actually belong.
Read
Manufacturing Systems
September 2026 · 6 min read
UAT Should Validate the Future State, Not Discover the Process
When user acceptance testing becomes the first place a manufacturing process is described end to end, the test is no longer a test. It is requirements gathering with a go-live date attached.
Read
Drafting
Planned pieces
How Hold Points Should Be Chosen
Quality
Why Utilization Problems Are Often Flow Problems
Manufacturing Engineering
A Practical Guide to Cp and Cpk
Data
Using SPC to Identify Supplier Risk Before Failure
Data
Why Manufacturing Dashboards Need Decisions, Not Just KPIs
Data
What Pump Manufacturing Can Teach Us About Liquid Cooling Quality
Infrastructure