Skip to content
Mohammad Al-Araidah

Pillar

Manufacturing Quality Engineering

Selected professional work and independent technical studies covering defect prevention, process control, equipment acceptance, supplier readiness, root-cause analysis and corrective action.

Philosophy

Quality at the source

The cheapest defect is the one that never leaves the process that created it. Every quality control downstream of that point is a way of paying for a failure that has already happened — inspection pays with labour, FAT pays with rework and schedule, and a field failure pays with the customer’s operation.

So my approach is to define requirements precisely, translate them into measurable acceptance criteria, put the inspection where the risk is rather than where it is convenient, use data to detect deterioration before it becomes nonconformance, and require objective evidence before closing anything.

The last clause is the one that does the work. “We understand why that happened” is not a closure. It is a hypothesis with a date on it.

The sequence

  1. Requirements

    Stated so they can be failed, not just agreed.

  2. Risk assessment

    Which failure modes matter, and where they would be detected today.

  3. Process controls

    Controls that hold without supervision.

  4. Inspection & testing

    Placed by risk and by when the evidence stops being obtainable.

  5. Nonconformance

    Raised, contained, and dispositioned by someone with the authority to accept the consequence.

  6. Corrective action

    Against the systemic cause, not only the unit.

  7. Verification

    Evidence that it worked, over enough production to mean something.

  8. ReleaseGate

    A decision with stated criteria — never an administrative step.

Professional experience

Quality work done on the job

Real projects in a professional role. Methods are described; employer drawings, records, parameters and data are not.

Also professional quality work, described elsewhere

A national first-place quality initiative built on statistical analysis and process redesign cut defects 10% ($43K) — summarized on the resume. The issue-closure governance behind an ERP transformation is quality discipline applied to process defects, and is written up in End-to-End Manufacturing Process Validation.

Artifacts

Engineering documents

Generated from the structured data behind the studies, each with a document-control header and marked as synthetic study material. Real files, not screenshots.

MQA-SQA-001 · Rev A

XLSX

Supplier Qualification Assessment — Northstar Thermal Systems

Weighted maturity assessment across eleven control areas, with live scoring formulas and decision bands.

Synthetic data — not for production use

Download XLSX

MQA-MRR-001 · Rev A

XLSX

Manufacturing Readiness Review — LC-1000

Readiness checklist across engineering, supply chain, manufacturing, quality, test and documentation, with open actions.

Synthetic data — not for production use

Download XLSX

MQA-ITP-001 · Rev A

XLSX

Inspection & Test Plan — LC-1000 Liquid Cooling Skid

Operation-level inspection and test requirements with owner quality points and required records.

Synthetic data — not for production use

Download XLSX

MQA-FAT-001 · Rev A

PDF

Factory Acceptance Test Protocol — LC-1000

Preconditions, test steps and acceptance criteria across visual, mechanical, controls, performance and documentation scope.

Synthetic data — not for production use

Download PDF

MQA-8D-001 · Rev A

PDF

8D Report — Cooling Skid Differential Pressure Nonconformance

Full D1–D8 investigation record including containment, root cause, corrective action, verification and prevention.

Synthetic data — not for production use

Download PDF

MQA-SRC-001 · Rev A

PDF

Shipment Release Checklist — LC-1000

Final release gate: FAT status, hold-point NCR closure, deviations, documentation turnover and preservation controls.

Synthetic data — not for production use

Download PDF

MQA-SSC-001 · Rev A

XLSX

Supplier Quality Scorecard — Template

Reusable quarterly scorecard: FAT first-pass yield, defects per unit, NCR aging, CAPA closure and documentation timeliness.

Synthetic data — not for production use

Download XLSX

Roadmap

Planned in this pillar

  • Supplier Quality Analytics — Multi-Supplier SPC Dashboard

    Independent study · Cp/Cpk, NCR aging, defect Pareto, supplier risk

    Data · Quality

  • Factory Acceptance Strategy for Mission-Critical Switchgear

    Independent study · Electrical equipment acceptance

    Quality · Infrastructure

  • Manufacturing Quality at the Source — Supplier Quality Playbook

    Independent framework · Reusable templates across the quality lifecycle

    Quality