Engineering lab / Interactive technical portfolio
Synthetic demonstrationCooling Systems Factory
Explore the operation, follow component lots and inspect the evidence behind each engineering decision.
factory-1.0 · Synthetic operation
Plan: 8 skids / 54.8 h assumed work. Baseline: 8 skids / 54.8 h.
This tab retains your scenario and demo reviews. Reset factory restores the original state.
All parts, suppliers, measurements and events below are fictional. Built to demonstrate engineering analysis and software design; no employer or customer engagement is implied.
SYN-OPS-01 / Baseline drawing context
Factory floor plan
32 × 20 m / illustrative arrangement
Select an area to inspect its function and records. Connections show process sequence; the plan is a teaching assumption, without travel optimization or a safety-code assessment.
Selected area
M1 / Valve machining
Finish the valve-spool diameter and inspect the process against its fixed reference.
- Station
- SYN-ST-M01
- Equipment
- SYN-MC-01
- Next operation
- Kitting K1 after component review
Valve-spool inspection history; 90 individual measurements.
Open SPC / process qualityOperator: SYN-021 · Fictional equipment fabricator. Purchased harness supplier: SYN-014. Factory and supplier roles are distinct.
Industrial engineering / baseline
210 loaded m / hypothetical week at 8 skids
Calculated from geometry and loaded trips. The overview drawing retains baseline geometry; quality decisions are independent.
Work design / A1 / baseline
Single-task lifting index 1.61
Synthetic workstation calculation. Layout geometry supplies location context; it does not establish reach, capacity or safety approval.
Continuous improvement / M1 / 32 experimental cuts
2 settings pass the study screen
Synthetic loss evidence and a randomized, replicated machining experiment. Draft changes preserve existing quality gates.
Manufacturing ML / M1 / 720 synthetic batches
Logistic regression / 20% inspection threshold
Compare trained models, inspect heldout errors and investigate a changed process. Inspection support; no release approval.
Production flow / SYN-FLOW-001 / simulation
1 assembly workers / 1 test stand pairs / 2 waiting slots
Configuration only. Inspect queues, line balance and 20-run simulated outcomes in the workbench; these differ from geometric calculations and quality acceptance evidence.
Requested output
8 skids
Per hypothetical week; planning input
Standard work content
54.8 h
Assumed work content; not forecast capacity
Illustrative order trace
3 orders
One unit each; subset of the operation
Suspect harness population
750 units
11 failures observed in 80 suspect-lot screens
Baseline: 8 requested skids / 54.8 h assumed work content. Baseline remains 8 skids / 54.8 h.
Component genealogy / Illustrative allocations
Follow an order into its evidence
Existing FAT unit. Supplier-material disposition and equipment acceptance are separate reviews.
Valve component / SYN-VS25
SYN-304
Measurements 71–90; Limited corrected run; not a completed long-term capability qualification.
Inspect SYN-304 in SPCPurchased harness / HX-12
SYN-B2 / supplier SYN-014
Received population 350; screening 2/40. Suspect supplier setup window; material disposition requires NCR review.
Inspect SYN-B2 in NCRAssembly record
SYN-WO-003 / SYN-LC-1000-003
Quantity 1 · current area T1 / Acceptance test
Inspect unit 003 in FATEach order illustrates one valve and one harness assignment. These three records are a genealogy subset, not a complete weekly schedule or inventory ledger.
Evidence register
Three independent quality episodes
SYN-RUN-01
32 signal observations / 68 samples
Investigation view; no simulated lot-release authority
Valve-spool inspection history; 90 individual measurements.
SPC-E01 · SPC-E02 · SPC-E03
Open SPC / process qualitySYN-NCR-026
OPEN / containment pending disposition
Supplier-lot review is independent of equipment acceptance
750 suspect supplier units; 11 failures observed in 80 suspect-lot screens.
NCR-E01 · NCR-E02 · NCR-E03 · NCR-E04 · NCR-E05 · NCR-E06
Open NCR / 8DSYN-FAT-003 Rev A
HOLD / unsigned
Unit SYN-LC-1000-003 only; 4 acceptance blockers
Acceptance record for unit SYN-LC-1000-003 only.
FAT-E01 · FAT-E02 · FAT-E03 · FAT-E04 · FAT-E05 · FAT-E06 · FAT-E07
Open Equipment FATTool-condition drift, supplier under-crimp and the wrong pump impeller have separate causes. A passing FAT does not resolve a supplier-material hold.
Planning comparison / Product structure
Baseline and visitor proposal
A modular liquid-cooling skid uses the component quantities below. Change the planning scenario to compare gross material requirements and assumed work content.
| Component / source | Per skid | Baseline / 8 skids | Selected / 8 skids | Change |
|---|---|---|---|---|
| SYN-VS25 / Valve-spool component Machining cell M1 | 1 each | 8 | 8 | 0 |
| HX-12 / Sensor harness Supplier SYN-014 | 1 set | 8 | 8 | 0 |
| SYN-PUMP-01 / Pump Purchased; supplier not modeled | 2 each | 16 | 16 | 0 |
| SYN-HX-01 / Heat exchanger Purchased; supplier not modeled | 1 each | 8 | 8 | 0 |
| SYN-FRAME-01 / Skid frame Purchased; supplier not modeled | 1 each | 8 | 8 | 0 |
| Assumed standard work content | 6.85 h | 54.8 h | 54.8 h | 0.0 h |
Gross requirements exclude stock availability and purchasing lead time. Standard work excludes losses and waiting; it is not a throughput, utilization or staffing estimate.
Process routing, records and metric definitions
Product routing
- R1 / Receiving to Q1 / Incoming quality — Purchased harnesses / incoming records
- Q1 / Incoming quality to K1 / Kitting — Dispositioned purchased material
- M1 / Valve machining to K1 / Kitting — Machined valve components after review
- K1 / Kitting to A1 / Skid assembly — Work-order kit
- A1 / Skid assembly to T1 / Acceptance test — Configured assembly
- T1 / Acceptance test to D1 / Release — Acceptance evidence
Metric dictionary
- Requested output / skids / hypothetical week
- Visitor planning input. Baseline is 8; not an observed production result.
- Gross component requirement / each or sets / hypothetical week
- Requested skids × component quantity per skid; excludes inventory netting and purchasing lead time.
- Standard work content / hours / hypothetical week
- Requested skids × assumed work minutes per unit / 60. Excludes rework, downtime and waiting; not a capacity or staffing forecast.
- Illustrative order trace / orders
- Three one-unit records illustrating component genealogy; not a complete schedule for the weekly demand.
- SPC measured population / observations
- 90 sampled measurements from the existing SPC case. Not total production or an inferred lot defect count.
- Suspect supplier population / units
- 400 in SYN-B1 + 350 in SYN-B2. Distinct from 11 observed sample failures.
Seeded planning history
Seed 26831; repeatable hypothetical demand periods. These periods are independent of the dated sequence inside each quality case.
SYN-P01: 9 skids · SYN-P02: 10 skids · SYN-P03: 8 skids · SYN-P04: 8 skids · SYN-P05: 7 skids · SYN-P06: 7 skids · SYN-P07: 7 skids · SYN-P08: 7 skids
One connected perspective
Physical requirements become data. Data becomes evidence. Evidence informs an operational decision. These demonstrations connect my manufacturing and quality foundation with the systems thinking used in enterprise transformation and product engineering.
Professional context
Explore my documented manufacturing experience, SAP readiness work and data and product development. The synthetic lab is separate from those professional records.
Download technical README