Rearrange the cooling-skid factory and compare loaded travel under explicit constraints.

Meet the engineer
Factory and quality workspaces

All parts, suppliers, measurements and events below are fictional. Built to demonstrate engineering analysis and software design; no employer or customer engagement is implied.

Baseline loaded travel

210 m / week

Displayed arrangement

210 m / week

Assumed handling cost

$28.80 / week

Compared with baseline

0 m less (0.0%)

SYN-LAYOUT-001 Rev A / baseline

Layout and loaded material flow

32 × 20 m · 1 m positioning grid

Select and drag a movable area, use its arrow keys, or edit coordinates. Lines follow clear grid routes between transfer points; thicker lines carry more loaded trips. Blue zones constrain utilities. Separate movements may share a transfer point and have zero aisle distance.

Visitor arrangement

Position and constraints

Footprint 7 × 8 m. Editing any view creates a visitor proposal.

0 constraint violations in displayed arrangement.

Feasibility review

Feasible under the stated geometry, services and route assumptions.

8 skids / hypothetical week

Compare arrangements at the same demand

ArrangementFeasibilityLoaded metresAssumed costChange from baseline
BaselineFeasible210$28.800 m less
Visitor proposalFeasible210$28.800 m less
Heuristic suggestionNot generatedNot scoredNot scoredNot compared
Download layout methodDownload movement assumptions

Inspect a route / Current arrangement

Loaded movement ledger

MovementFrom / toWeekly quantityCapacity / tripLoaded tripsRoute / mLoaded m
R1 / Q18 harness sets42816
Q1 / K18 harness sets42816
M1 / K18 valves421734
K1 / A18 kits18540
A1 / T18 skids181188
T1 / D18 skids18216

Trips are rounded up for partial batches. Geometry assumes authorized component disposition and equipment acceptance before transfer; planning does not clear those gates.

From-to matrix, constraints and calculation basis

One product family: the existing modular cooling skid. Demand changes volume; no additional product mix is modeled. Every compared arrangement uses identical flows and costs.

Loaded trips / hypothetical week at 8 skids
From / toR1Q1M1K1A1T1D1
R1 / Receiving0200000
Q1 / Incoming quality0002000
M1 / Valve machining0002000
K1 / Kitting0000800
A1 / Skid assembly0000080
T1 / Acceptance test0000008
D1 / Release0000000

Geometry and services

Fixed footprint sizes; R1 and D1 are fixed. Entire M1 and T1 footprints must remain in their indicated service zones. Kitting includes bounded component staging within its footprint. Area pairs retain 2 m separation on at least one axis. Routes use four-neighbour 1 m grid steps, with 1 m clearance from footprints and walls. Transfer points sit 1 m outside the top/bottom face, at the rounded horizontal centre. This conservative orthogonal model does not assess actual vehicle turning, fire access or workplace safety.

Minimize loaded travel metres at the selected demand; reject infeasible arrangements. Batch trips supply the objective weights. The bounded search checks baseline, proposal, coordinated starts and local moves; it returns the best feasible evaluated arrangement. Port-to-port loaded travel only. Empty returns, within-area maneuvering, congestion, time, staffing and real-world safety approval are not modeled.

Loaded travel / metres / hypothetical week
Sum of shortest grid route distance × loaded trips for the six declared movements. Excludes empty returns and within-area movement.
Loaded trips / trips / hypothetical week
For each movement: ceiling(requested skids × units per skid / batch capacity). Partial batches still require a trip.
Assumed handling cost / USD / hypothetical week
$0.08 per loaded metre plus $0.40 per loaded trip; fictional composite cost assumptions, without a wage or time forecast.
Change from baseline / metres and USD / hypothetical week
Baseline minus candidate, with identical demand, batches, costs and route rules. Positive values are hypothetical reductions. Infeasible arrangements are not compared.

All results are synthetic calculations. No measured travel reduction, realized cost savings, confidential factory layout or employer engagement is implied.

Factory planning scenario and reset
SYN-OPS-01 / Factory overview

factory-1.0 · Synthetic operation

Plan: 8 skids / 54.8 h assumed work. Baseline: 8 skids / 54.8 h.

This tab retains your scenario and demo reviews. Reset factory restores the original state.

One connected perspective

Physical requirements become data. Data becomes evidence. Evidence informs an operational decision. These demonstrations connect my manufacturing and quality foundation with the systems thinking used in enterprise transformation and product engineering.

Professional context

Explore my documented manufacturing experience, SAP readiness work and data and product development. The synthetic lab is separate from those professional records.

Download technical README